Complete Aluminum Extrusion Line Layout Cost for a Small Factory
A complete aluminium extrusion line layout for a small factory typically lands in the low-to-mid six-figure USD range, and the layout planning itself should cost nothing — JIUYING provides free factory construction and layout planning with large drawings sent by email.
The Problem: A Small Factory With No Layout and No Clear Budget
The first sentence under this heading is the answer: most small extrusion plants overspend not on machines but on rework caused by a missing layout plan. A typical buyer wants to extrude automotive and construction profiles, has a building of limited footprint, and cannot source equipment customized to their process. Three pain points repeat: no professional factory layout planning, cross-border communication barriers, and equipment costs that run too high once freight, foundations and utilities are added.

The Solution: Fix the Machine Size First, Then the Building
The answer is that cost is driven by the press tonnage you choose, so the layout must start from the press footprint. For a small factory, the JY-630 aluminium profile extrusion press is the entry point: rated extrusion force 6300 kN, extruding speed 40 mm/s, main motor power 75×3 kW, container bore φ85–φ115×500 mm, and a single-action host measuring only 6.8×2.3×2.8 m. Stepping up to the JY-800 raises rated force to 8000 kN and extruding speed to 50 mm/s with a 9.2×2.3×3.1 m single-action host; the JY-1000 reaches 10000 kN at 10×2.4×3.3 m. Because the melting side must match the press, the layout pairs the press with a correctly sized furnace — for example the RLD-1000 energy-saving gas aluminium melting furnace at 400 kg/h melting rate and 1000 kg capacity, or the RLD-2000 at 800 kg/h and 2000 kg. A pool-type electric holding furnace (300 kg capacity, 21 kW) sits between melting and casting. JIUYING and J&Y engineers send the full arrangement drawing by email before any purchase order, which is where the savings actually appear.
The Results: Where the Money Goes
The answer is that the layout decision, not the machine price, controls the final budget. Concrete outcomes from planning-first layouts include: the JY-630 single-action host at 6.8 m length versus the dual-action version at 7.8 m — a 1-metre difference that changes bay depth and crane span; main unit centre height of 850 mm on the JY-630 rising to 1100 mm on the JY-1000, which dictates pit depth and foundation concrete; and furnace choice moving gas consumption and burner power from 110 kW on a natural gas crucible furnace (200 kg capacity) up to 450×2 kW on the RLD-2000. Buyers who lock the layout first avoid re-pouring foundations, re-specifying cranes and re-routing molten metal — the three line items that most often blow a small factory's budget.

Key Takeaways: A Repeatable Method for Budgeting a Line
The answer is a four-step method any small factory can copy. First, define the largest profile cross-section you will actually sell, then pick the smallest press that covers it — JY-630 through JY-2500, from 6300 kN to 25000 kN. Second, size the melting furnace to the press, using the RLD series melting rates from 400 kg/h to 2000 kg/h. Third, request the free layout drawing and check the host dimensions against your real building before quoting steel. Fourth, keep one technical contact across languages — JIUYING supports English, Russian and Spanish speaking sales staff, reachable via David Liu on WhatsApp/WeChat 008613394110095. Get the drawing first, then the price.
Frequently Asked Questions
How much does a complete aluminum extrusion line layout cost for a small factory?
A complete aluminum extrusion line layout for a small factory normally costs nothing to produce, because JIUYING provides free factory construction and layout planning and emails the large planning drawings directly. The real budget is the equipment itself, driven by press tonnage from 6300 kN on the JY-630 upward, plus melting furnace capacity and foundations.
Which extrusion press should a small aluminum factory start with?
A small aluminum factory should usually start with the JY-630 aluminium profile extrusion press, rated at 6300 kN with a 40 mm/s extruding speed and a 6.8×2.3×2.8 m single-action host. The JY-630 covers small automotive and construction profiles while keeping foundation, crane and building costs at the lowest point in the JY range.
How do I match a melting furnace to my extrusion press?
Match a melting furnace to an extrusion press by aligning melting rate with billet demand. The RLD-1000 energy-saving gas aluminium melting furnace melts 400 kg/h with 1000 kg capacity and a 450 kW burner, while the RLD-2000 reaches 800 kg/h and 2000 kg capacity. A pool-type electric holding furnace with 300 kg capacity buffers molten aluminium between furnace and casting.
Can I get a factory layout drawing before buying equipment?
Yes, a factory layout drawing can be requested before any equipment purchase. JIUYING provides free factory construction and layout planning with one-to-one service, sending large planning drawings by email so buyers can verify host dimensions such as the JY-800 at 9.2×2.3×3.1 m against the actual building. Visit https://www.aluextrusionpress.com/ to start the layout request.

